10. Conducting Field Surveys

  • Katie Horak
  • Janet Hansen

Conducting a heritage field survey is a process of discovery, collaboration, and constant refinement. For many heritage professionals, a field survey is the favorite aspect of their work. It allows them to immerse entirely in the vernacular of a particular place and read the way the built fabric and cultural practices change and evolve in response to their environment, including climate and terrain, local land use policies, economy, culture, and ethnicity. There is no match for the experience of conducting fieldwork in person and, even if for only a little while, being conversant in the unique language of a particular place.

Fieldwork is both physically taxing and mentally exciting; it is at the same time rooted in technical rigor and instinctive decision-making. It is an opportunity for close and mutually edifying collaboration on a region’s history and prehistory among heritage professionals, managing agencies, community members, heritage organizations, and scholars. A field survey requires endless flexibility, as no survey is without surprises or proceeds from phase to phase exactly as planned. Inevitably, methodologies need to be honed, team members may not perform as required, technology fails, or assumptions about a particular heritage resource type are proven otherwise. Thus, as much as experience and academic qualifications are important when assembling a survey team, either internal to a managing agency or organization or as part of a consultant team, flexibility and communicative collaboration among all team members are perhaps most important.

Field surveys are and have been a vital aspect of heritage conservation practice for decades (in the United States, for half a century), and in many ways the practice remains, at its core values and objectives, relatively unchanged. Field survey implementation, however, has adapted dramatically to new technologies in data collection and storage, including geographic information system (GIS) mapping and data collection software that can be used on a computer that fits in your hand, linking photos and attribute data together, and enabling integration of survey data into local planning practices.1

This chapter focuses on the technical aspects of conducting field surveys and illustrates how the concepts, tools, and methods discussed in chapter 8 are put into practice. The recommendations provided here are rooted in the experience of a heritage professional whose survey work has focused on historic aboveground resources and has been predominantly conducted in urban environments in the United States. Principal author Katie Horak conducted field surveys for SurveyLA from the pilot phase to completion, in addition to having participated in surveys in numerous diverse environments throughout California and in the city of New York, in roles including professional consultant and managing-agency staff. To the greatest extent possible, the content of this chapter has been drawn from these experiences and then been generalized to apply to heritage surveys in any area, across the world (fig. 10.1).

ExpandFIGURE 10.1 SurveyLA heritage field surveyor at work. Architectural Resources Group, Los Angeles

Understanding the Project Scope

Field surveys may be conducted in house by staff of the managing agency or organization, by professional consultants, or by a combination of the two. Consultants are typically selected as part of a competitive bid process and then placed under contract with the managing agency or organization. While it is acknowledged that surveys may sometimes be led and conducted by members of a community and volunteers, in these cases it is still recommended that the work be managed or at least reviewed and vetted by experienced heritage professionals who meet any applicable qualification standards. When selecting external consultant teams, the managing agency or organization should carefully evaluate how well the proposer understands and responds to the scope of the survey and project objectives, as conveyed in their approach to implementation.

Developing the Approach to the Survey

By the time heritage professionals are solicited to conduct a heritage survey, the project may have been well defined through a planning process (see chapter 7). The initial role of the heritage professional, then, is to understand the survey project in as much detail as possible and develop the approach to project implementation.

The major components of a field survey include the following (see Field Survey Implementation for details):2

  1. Research

  2. Reconnaissance survey

  3. Intensive-level survey and recording

Although all these tasks are essential to a successful field survey, they may be conducted in phases, and some tasks may be conducted concurrently (fig. 10.2). Once the parameters and goals of the project have been defined, the survey team can predict the level of effort and documentation that will be needed for all tasks within the scope of work to successfully distribute resources and plan for the work.

Sample Survey Project Timeline
  MONTH 1 MONTH 2 MONTH 3 MONTH 4 MONTH 5 MONTH 6 MONTH 7 MONTH 8 MONTH 9 MONTH 10 MONTH 11 MONTH 12 MONTH 13
                                                                                                         
Data Collection System Installation / Preload Data Review 1 week   1 week  
Data Collection System Installation / Preload Data Review   2 weeks  
Research 25 weeks  
Thematic Framework/Historic Context Statement 11 weeks   11 weeks  
Reconnaissance Survey   11 weeks  
Intensive Field Survey and Recording   25 weeks  
Data Downloads   1 week   2 weeks   1 week   2 weeks   2 weeks  
Data Management/Revisions   29 weeks  
Project Team Peer Review   1 week   1 week   1 week  
Feedback Logs   46 weeks  
Survey Reports   1 week   1 week   1 week  
ExpandFIGURE 10.2 Sample SurveyLA field survey schedule illustrating the sequencing of tasks and estimated times for completion. Los Angeles City Planning Office of Historic Resources

A survey project will ideally have a finite budget and schedule predetermined by the managing agency or organization during survey planning. Survey professionals will need to use their experience with similar projects to plan for the work within these parameters to avoid overspending and causing delays in schedule. An understanding of the following factors is important to consider when developing a survey project approach:

  • Survey purpose, goals, and objectives.

  • Size of the survey area, both in physical distance and number of resources to be surveyed:

    • Drawing from experience with surveys in similar environmental and geographic conditions, how many properties and/or how large an area can be surveyed in a day?

    • Are there logical ways to break up the survey area into smaller, more manageable components for multiple teams to survey concurrently?

    • How long will it take to travel to and from the survey area each day?

  • Topography and geography. What is the terrain of the survey area? For instance, it will take longer to survey a hilly area with winding roads or an area that must be walked rather than driven than a relatively flat urban area of gridded streets.

  • Survey technology to be used in the field:

    • Is the technology going to be provided by the managing agency or organization, or will it be up to the consultant to identify the software to be used in the field?

    • Will the team need to budget for hardware, software, or data storage needed to conduct and manage the work?

  • Level of documentation and amount of data to be collected. How much data needs to be collected for each heritage resource, and roughly how long will it take?

These factors should be considered when developing the survey approach, and in doing so the managing agency or organization will gain a level of comfort that the professionals implementing the survey have thoughtfully considered the defined project parameters and a path to successful implementation.

Tips for Consultants: Putting Together a Successful Competitive Bid

Often, a managing agency or organization will select consultants to conduct heritage surveys through a competitive bid process rather than conducting the survey with internal staff. The following recommendations are intended for heritage consultants who may be preparing and submitting a proposal for the work:

  • Convey a thorough understanding of the heritage survey goals and objectives.

  • Compile a diverse and expert team with direct, related project experience (see the following section for more information about project staffing).

  • Illustrate an understanding of the survey area and anticipated heritage resources.

  • Convey a strong communication and management framework and quality control protocols.

  • Provide client references who can speak to successful completion of similar projects.

Assembling Field Survey Teams

This section focuses on professional team composition for heritage field surveys, with considerations for technical skills, experience, and specialized expertise. When assembling professional team members to conduct a heritage survey, it is important not only to consider qualifications and experience with similar projects but also to look for the following:

  • A proven track record of conducting heritage surveys consistently, efficiently, and accurately.

  • Proficiency with the survey technology to be used in the field.

  • Specialized knowledge about the subject area or resource types to be surveyed. For instance, for theme-based heritage surveys (e.g., surveys of recent-past architecture, those associated with ethnic history, or archaeological surveys), it is recommended to include team members with specialized knowledge of the themes or particular archaeological resources to be studied.

Particularly with large-scale heritage surveys, field teams may include a number of collaborators, making a strong management structure essential. Teams are led by a field survey manager, who handles day-to-day contact with the survey project manager, ensures work is adhering to budget and schedule constraints, and provides quality assurance. Technical staff working under the direction of the field survey manager should meet or exceed any applicable professional qualification standards for conducting heritage surveys and may also provide specialized knowledge in survey technology, regional history, archaeology, or other pertinent themes such as a particular facet of architectural and/or ethnographic history. Survey teams may also include interns and/or community experts, as further described below.

The number of professionals needed to complete a heritage survey can vary widely based on an assortment of variables, although generally the size of the team is directly linked to the quantity of heritage resources to be surveyed and recorded. For instance, a team recording a hundred resources may comprise only two surveyors, while a team recording ten thousand resources may need multiple teams of two surveyors working collaboratively.

When staffing a field survey, it is important to thoroughly understand the scope of the project as defined by the managing agency or organization and to consider the following:

  • Project schedule, and the overall timeframe allocated for each associated task of the survey (see fig. 10.2). For instance, if an expedited schedule is desired, more staff will be needed to conduct the work.

  • Project budget.

  • Efficiency of survey technology.

  • Estimated number of heritage resources to be recorded.

When working with consultant teams, heritage field survey projects are often too labor intensive for one consulting firm to handle alone, and a collaboration of multiple firms can accomplish a number of positive outcomes:

  • Built-in peer review of heritage evaluations made in the field, providing benefit to the team and to the managing agency or organization. With professionals from two or three firms making field evaluations together, the agency or organization has some assurance that the survey findings have been vetted from the differing experiences and judgment of multiple professionals.

  • Contributions provided by the diverse perspectives and areas of specialized expertise of team members from different consulting firms.

  • A reduced pool of project bidders, saving on the time needed for the lead agency or organization to review proposals and reducing competition among professional firms.

As discussed in earlier chapters, in the case of SurveyLA, field surveys were completed in phases by geographically based community plan areas. Each survey phase included two to four plan areas, collectively comprising approximately forty thousand to ninety thousand properties. Survey teams included, at a minimum, six or seven staff from two or three professional firms, working collaboratively under the management of one lead consultant firm. The teams also included interns and community experts (fig. 10.3), as described below.

ExpandFIGURE 10.3 Field survey staffing model showing key positions and participants in the field survey process. Los Angeles City Planning Office of Historic Resources

Student Interns

Including student (or recent graduate) interns on a heritage survey team can be an extremely valuable and mutually rewarding experience. It is recommended that student interns be paid, as they provide a professional service, although they may be paid a relatively nominal amount compared to permanent staff due to the temporary, introductory-level nature of their role; monetary compensation is supplemental to the valuable work experience of participating in a heritage resource survey with an experienced team.3

A number of tasks are well suited to interns, including:

  • Archival research about the history, development, and character of a survey area in local and online repositories

  • Heritage resource–specific research, such as reviewing permit files for building resources, researching potentially significant persons and events, and so on

  • Producing field maps in GIS

  • Field surveys, working in tandem with qualified heritage professionals

Local Heritage Experts

When compiling teams for heritage surveys, it may be important to enlist “local experts”—individuals who are experts in the history and development of a particular area and can provide an insider view of community heritage—to collaborate with heritage professionals on the survey. These experts may include local historians, cultural experts, subject experts, academics, and others.

Roles for community experts may include the following:

  • Research assistance and identification of local repositories or other locations of relevant information

  • Identification of and serving as a liaison with local constituent groups to ensure effective and comprehensive community outreach (see also Public Outreach and Engagement in chapter 8)

  • Participation in a tour of the survey area, during which significant resources are shared by the expert with the rest of the team

  • Review of preliminary survey findings to provide input on properties that may have been overlooked

Survey Training and Guidance

Every heritage survey brings its own unique set of challenges and conditions, and even the most seasoned heritage professionals need training. In nearly all survey projects, the work evolves as the project proceeds based on lessons learned in the field, actual heritage resources encountered, and proficiency with field technology. It is important to take the time to adapt survey methodologies when change is beneficial, and for internal team training to be provided not only at the beginning but also throughout the life of the project to ensure that all surveyors are conducting work in a consistent manner. Three types of survey training and guidance may be provided:

Classroom and Field Training

Classroom and field training are effective ways for survey team members to get acquainted with one another and with survey tools and procedures. Training should take place before fieldwork proceeds in earnest, and all members of the survey team should attend. The nature of the training will be determined by the structure and makeup of the overall project team (see Assembling Field Survey Teams). Training, for example, may be the role of one or more survey project personnel, such as the project manager, field survey manager, and team members who specialize in survey technology and data management. Training by a professional photographer with expertise in photo-documenting heritage resources is also recommended, to provide tips and guidance about taking photographs that capture meaningful information that will meet the survey’s goals (figs. 10.4 and 10.5); see also ().

ExpandFIGURE 10.4 Classroom training conducted for SurveyLA. Surveyors received classroom training on recording methods and procedures, field photography, and use of the citywide historic context. Los Angeles City Planning Office of Historic Resources
ExpandFIGURE 10.5 Field training conducted for SurveyLA. During hands-on field training, surveyors practiced using the mobile digital data collection system to record various resource types in geographic areas selected for the pilot surveys. Los Angeles City Planning Office of Historic Resources

Topics covered in classroom and field training may include (and are not limited to):

  • Use of survey equipment and technology

  • General recording processes and protocols

  • Recording of a variety of heritage resource types

  • Applying thematic frameworks and historic context statements

  • Making assessments of heritage significance

  • Field photography

  • Surveyor conduct

Field Survey Manual

As mentioned in chapter 8, it is recommended that a written manual be developed that provides detailed instructions for survey data entry processes and protocols and making heritage resource assessments of significance. All surveyors should be provided with the field survey manual for field and classroom trainings and as an ongoing reference throughout the surveys. Topics covered in the classroom and field training should be addressed in the manual, and contact information for the project manager(s) and IT support should be provided.

Internal Team Training

Supplemental internal training provided by field survey managers further ensures that heritage resources are recorded to a consistently high quality and standard by (at times) many different team members. Internal training sessions may be conducted periodically throughout the project as the survey progresses and as lessons are learned in the field.

In addition to the field survey manual, it is also useful to prepare survey recording standards and guidelines that are specific to resources in a survey area. Recording standards may, for example, include standardized evaluation language for heritage resource types identified during fieldwork to ensure that survey team members are categorizing and describing significance and eligibility for designation or listing in a consistent manner. This is especially important for narrative free-text fields that are not associated with controlled vocabularies.

Field Survey Implementation

Once the survey team has been selected and trained, the fieldwork can commence. Field surveys that cover entire geographic areas are most accurate and effective when they are comprehensive. That is, every street should be driven, biked, or walked; every dirt road or field traversed; every trail hiked; and ultimately, every physical element considered. Only then can a comprehensive and thorough understanding of an area’s heritage resources be achieved. Ever-improving online mapping, satellite imagery, and interactive panoramic street view photography (such as Google Street View or KartaView) may make it tempting to conduct some of the fieldwork online to save time and resources. Indeed, using online satellite and aerial imagery is standard practice for certain types of archaeological site identification, as input to impact assessments, and may be necessary for areas of armed conflict. However, although this technology may be helpful for spot-checking resources and providing a high-level understanding of an area for recording the built environment, field surveys are ultimately more accurate and effective when conducted in person, whenever possible.

The following sections describe the phases of a heritage survey. The development of historic context– or theme-based frameworks for a survey project is discussed in detail in chapter 8.

Research

Primary and secondary source research plays a valuable role at different stages of the heritage survey project. General research takes place at the beginning of the project, in association with the reconnaissance survey, and provides the team with a better understanding of the heritage survey area and the distribution and types of resources anticipated to be encountered. More in‑depth, resource-specific research is generally conducted after the reconnaissance survey, as part of the intensive-level survey and recording process, once a preliminary list of potential heritage resources has been compiled to support heritage evaluations to be made and recorded during the documentation phase.

Preliminary research may include the following:

  • Review of existing inventory and previous heritage survey results and data for the subject area.

  • Review and coordination of information provided by the public during community outreach efforts. (See Public Outreach and Engagement in chapter 8 for more detail.)

  • Conversations with community members, who may be able to provide information about heritage resources that represent an area’s social, cultural, and ethnic history. These conversations may be formal (e.g., oral histories) or informal individual or group interviews collected through community outreach activities.

  • Review and analysis of historic maps and aerial photographs (hard copy or geospatial data), which can provide information relating to patterns of settlement, ethnographic movement, land use, and development and redevelopment over time. These activities relate to methods of analysis, such as historical map regression (see the corresponding glossary entry and Research and Investigation in chapter 2).

  • Review and analysis of other geospatial data and reference layers prepared for the survey area (see Geospatial and Other Reference Data in chapter 8). For SurveyLA, for example, construction or built dates provided information to produce GIS-based “chronology maps” for each community plan area. These maps shaded legal parcels by date of construction to provide field surveyors with a visual representation of periods of development of an area (fig. 10.6).

  • Review of source material directly related to the history and development of the survey area, to better familiarize the survey team with what they may encounter in the field.

ExpandFIGURE 10.6 Chronology map for the Westchester–Playa Del Rey community plan area illustrating a primarily post–World War II period of development. Architectural Resources Group, Los Angeles

Reconnaissance Survey

This section explains how to carry out a reconnaissance survey using SurveyLA as an example. Level of Detail and Documentation of the Survey, in chapter 8, addresses factors for deciding when a reconnaissance survey may be useful.

A reconnaissance survey is a first look at a heritage survey area, which is often seen through the windshield of a slowly moving car or, in geographic areas where driving is not possible, on foot or by bicycle. Reconnaissance is essential to familiarizing the survey team with the project area and identifying potential heritage resources for further study and documentation. It is often conducted concurrently with the development of the survey’s thematic or contextual framework, as it provides essential information about development patterns and the presence of potential heritage resources.

It is also important that information about potential heritage resources provided by the community as part of outreach efforts be reviewed as part of the reconnaissance survey. A comprehensive reconnaissance survey is essential to providing comparative analysis of heritage resources; only when you traverse every street or part of a survey area in a relatively short period can you unequivocally have information about the comparative rarity or significance of a heritage resource type.

In the case of SurveyLA, the reconnaissance survey team included several (three or four) senior-level team members working together in a single vehicle, with one member navigating using a printed GIS map and color-coding areas as they were driven to ensure no physical element was missed (fig. 10.7). Identified potential heritage resources were also marked on the map and included in a written list, with notes. Surveyors were guided by visual observations as well as the geospatial reference layers preloaded in the digital data collection system (e.g., construction dates, previous survey data, community input).

ExpandFIGURE 10.7 Map developed for conducting a reconnaissance survey in the city of Tustin, California. Architectural Resources Group, Los Angeles

By the end of the reconnaissance survey, the team had produced a list of potentially significant heritage resources in the survey area, which would be further considered for resource-specific research—and for recording, if identified as potentially significant. Having several team members in a car at once assures that the reconnaissance work is comprehensive and that there is dialogue about what was surveyed among experienced surveyors. This customized approach to reconnaissance work was developed by the consultant team during the early phases of SurveyLA and has since been successfully used in heritage surveys of numerous diverse geographic areas in the United States.

Intensive-Level Survey and Recording

As referenced above, resource-specific research is needed to bridge the gap between a reconnaissance survey and recording heritage resources, as part of an intensive-level survey. While a reconnaissance survey primarily collects information about potential heritage resources based on field observations, intensive-level recording requires supplemental research to fully understand resource significance. Research activities and information sources may include:

  • Historical building records, to confirm date of construction, architect/designer, owner, alterations, and other relevant information

  • Historical maps and photographs

  • Historical journals, periodicals, books, and other primary and secondary sources to identify significant persons, events, architects, and other information

  • Continued community outreach and consultation with knowledgeable individuals and organizations

Once research has been completed, the survey team can commence recording heritage resources using digital data collection technology. The type and level of detail of documentation required is determined by the needs of the managing agency or organization for the survey, based on defined survey standards and guidelines, as previously discussed, as well as the overall goals and objectives of the project. To keep survey projects as manageable and cost- and time-effective as possible, managing agencies may opt to record only those heritage resources that have been identified as significant and thus belonging in a corresponding inventory. In most survey areas, only a small percentage of assets encountered in the field will be eligible and worthy of recording. Those physical elements that are not significant and eligible do not need to be revisited and recorded as part of the intensive-level survey, unless other survey objectives necessitate recording of all resources in a survey area.

To ensure consistent quality of intensive-level survey data, periodic data reviews are recommended throughout the recording process, and not done solely at completion of a survey.

Final Reports

At the culmination of any survey project, the survey team prepares a narrative report that documents and summarizes project objectives, scope, methodology, activities, and outcomes. In most cases, the report will offer valuable documentation of the survey effort and its findings for future use. In the case of SurveyLA, each phase of the survey was documented with a survey report that was published online. (For more information, see chapter 11.)

Some Pointers on Field Photography

A field survey’s photographic record of heritage resources documents the visual basis for evaluations made in the field and is valuable evidence of the condition of a resource at a specific time. Photographs collected and stored as part of a heritage survey are often consulted for many years to come, both by the agencies utilizing the data once it is incorporated into the inventory and by the public. The following basic pointers can be used to guide field photography.

  • Account for environmental considerations, such as the position of the sun, when planning the field survey. On sunny days, consider what time of day will be optimal for a given survey location. Preplan for light to avoid shadows, and keep the sun behind you and out of the photographs. Overcast days are always optimal for field photography, as the light is consistent across all surfaces and glare is minimal ().

  • If it is safe to do so and if time permits, take your photographs on foot rather than out the window of a car. It often takes some walking around a resource to ascertain the best photographic view, and this is not possible from a car window.

  • Be sure to check photographs before moving on, to ensure consistency and quality.

Final Recommendations to Surveyors

Because survey teams are often composed of private consultants working on behalf of a governmental agency, it is important that surveyors remain cognizant of their role working in an official capacity on the agency’s behalf. It is recommended that all surveyors have with them a signed letter from the managing agency that explains the purpose of the survey and provides agency contact information to serve as credentials to people they encounter during survey activities.

It is also recommended that surveyors document the process in a journal and, most importantly, with digital photographs. Each day in the field brings a new adventure that does not make its way into the record of the project: a conversation with a community member, the discovery of local cafés for lunch or coffee, unexpected encounters with heritage assets, and interactions with survey team colleagues. Photographic documentation of all phases of the project from beginning to end—including pilot surveys, training, fieldwork, and recording—will help ensure not only that the collective memories of the process are not be lost but also that the lessons learned are carried forward for future survey projects.

Making Assessments of Heritage Resource Significance

Heritage resource assessment or evaluation is the process of applying established local, regional, national, or international assessment criteria, thresholds, and other guidelines to determine heritage significance based on intensive-level field observations, research, community input, and comparative analysis. Assessments identify resources that best represent important aspects of the history and development of an area, as defined by the criteria, and provide information to guide heritage designation, planning, and management programs.

Because the assessment process is based on the evaluation criteria, and associated guidelines for their applications, this section does not provide detailed information on the evaluation process itself. Rather, it provides general considerations and recommendations for assessments related to the process of conducting heritage surveys, and in particular those applying a historic context– and/or theme-based approach, using a case study example from SurveyLA. (See also .)

Participants in Making Assessments of Significance

Resource evaluation is a primary responsibility of heritage professionals who have completed the field surveys. (Note, when assessing certain types of heritage, such as those of importance to indigenous communities or intangible heritage, community-affiliated leaders or experts may be relied on to make assessments.) In some cases guidelines require assessments to be performed by “persons qualified by education, training, and experienced in applying the relevant criteria in the geographical area under consideration” (). Field professionals will have extensive experience applying assessment criteria and other guidelines for evaluation. They will also have a broad understanding of the type, quality, and distribution of resources in the entire survey area and the contexts and themes they represent. Surveyors will have an informed perspective on relative significance based on comparative analysis and considerations such as how common, rare, or unique typologies may be; integrity and authenticity; and other factors.

Collaborating and consulting with the public throughout the survey process helps ensure that properties that are documented and evaluated represent the values and interests of the entire community. (Various opportunities to involve the public are discussed in chapter 8, in the section Public Outreach and Engagement.) Input is particularly valuable for resources that have social, ethnic, and cultural meaning that may not be readily apparent from field observations. Community members can bring to light stories about places, people, events, and practices that are not yet well known or documented, provide important research, and identify additional contacts and sources of information.

Role of Peer Review

Public input in heritage assessments of significance can also include a peer review panel or committee that meets at regular intervals, under the direction of the survey project manager, to review survey findings. The frequency of the meetings may be decided based on the phasing or sequencing plan for the surveys. Special meetings may also be called if there are particular issues to work through.

Peer review can provide an important check against consistent bias among field surveyors, and the panel can represent a range of disciplines and perspectives. For details, see the Peer Review in Heritage Surveys sidebar.

Considerations for Making Assessment of Heritage Significance

The process for assessing heritage significance can be designed to align with the professional standards and methodology of the survey. The following are points to consider.

  • In many cases, particularly in larger or more complex heritage survey projects, it may be advantageous to involve multiple heritage specialists and community experts in the evaluation process. The ability to leverage this combined expertise to build consensus during the evaluation process can help produce consistent and defensible evaluation findings.

  • Resources may represent layers of significance and may be evaluated under multiple contexts and themes. For example, a commercial building may be an important example of its architectural style as well as associated with an important business in a community.

  • Resources may be evaluated for significance under one or more heritage designation or registration programs (e.g., national, regional, local). For instance, SurveyLA evaluated resources for listing in the National Register of Historic Places, the California Register of Historical Resources, and as Los Angeles Historic-Cultural Monuments.

  • Anticipate that some resource types may need to be reevaluated after a survey is complete and final data has been compiled. At that time, the entire pool of a resource type will be known, and a more complete comparative analysis will be possible to best understand significance thresholds.

  • When using a context- or theme-based approach, provide training to surveyors in the application of contexts, themes, and eligibility standards to both categorize and evaluate resources.

  • It is recommended that the field data collection system and process include a mechanism to flag resource types that may be important but that have not been identified in a context or theme developed for the survey. This information can help revise and augment thematic frameworks and narrative historic contexts over time.4

Evaluation as Part of the Survey Process

Heritage resource analysis and evaluation is a sequential process that is guided by the consistent application of field survey tools and methods (). Following the previous discussion on conducting field surveys, and using SurveyLA as a model, assessment steps (fig. 10.10) include the following:

  1. Identify the heritage resource for inclusion in a survey through prefield research, community outreach, and/or a reconnaissance survey.

  2. Complete intensive-level field work, research, and community outreach and consultation sufficient to provide a complete understanding of the history of the heritage resource, including physical characteristics, changes and alterations over time, and associative values.

  3. Identify and classify the resource type within one or more historic contexts or themes developed for the survey or for the related heritage inventory.

  4. Apply the evaluation criteria and associated eligibility standards established for the resource type; that is, determine whether the resource retains the relevant essential physical and/or associative qualities and characteristics and retains sufficient integrity or authenticity to convey its significance.

  5. Complete the evaluation, including a comparative analysis with other identified resources of the same type, and make a final determination that the resource meets one or more of the evaluation criteria used for the survey.

  6. Prepare a narrative significance statement to summarize and justify the findings of the evaluation.

  7. Record and incorporate the findings of the evaluation into the survey and then the inventory.

ExpandFIGURE 10.10 Evaluation process for heritage surveys. Resource evaluation is the culmination of field surveys, research, and community outreach and collaboration. Janet Hansen

SurveyLA Case Study in Heritage Resource Assessment: Goodyear Gardens Historic District

The survey and evaluation of the Goodyear Gardens Historic District in Los Angeles illustrates the assessment model presented above. The potential historic district was documented by SurveyLA field surveyors as part of the Southeast Los Angeles community plan area, which comprises roughly fifty-four thousand legal parcels and is located directly south of downtown Los Angeles. Goodyear Gardens is an example of a heritage resource that was not identified as part of any prefield research or community outreach. Rather, it was newly discovered during the field survey process. The sections below describe the assessment steps followed for the potential district.

Reconnaissance Survey

During the reconnaissance survey, the survey team methodically drove every street in the community plan area, keeping track of progress on a paper map and noting potential heritage resources to research further and possibly record during the intensive survey.

Southeast Los Angeles is mostly flat in terrain and composed of numbered streets laid out in an expansive rectilinear grid plan. The area was historically developed with early twentieth-century single-family neighborhoods, linear commercial corridors, and some industrial development, and was well serviced by streetcars. To surveyors, the visual character appeared very consistent: street after street of modest cottages and Craftsman bungalows.

When surveyors drove down 59th Place, they noticed a small shift in visual character, likely perceivable only to those who had driven countless blocks in the same neighborhood paying close attention to the aesthetics of the built environment. Although the street was composed of single-family residences similar in scale to surrounding blocks, the houses appeared to have been designed as part of a small subdivision of modest houses with only a few consistent models and architectural styles: a Tudor Revival model, a Colonial Revival model, a Craftsman model, and a flat-roofed model that resembled Prairie School, which is uncommon in Los Angeles (fig. 10.11).

Figure 10.11 Representative architectural styles of houses from the Goodyear Gardens tract identified by SurveyLA as a historic district. Goodyear Gardens is a rare intact example of worker housing in Los Angeles. Los Angeles City Planning Office of Historic Resources

Using the preloaded reference layers in the mobile survey application (see Designing Digital Surveys in chapter 8), surveyors could see that these houses were all constructed in the same year: 1920. Field observations also noted the houses’ condition and alterations that had been made to them. The survey team members agreed the neighborhood was something to research further, and they noted it on the reconnaissance map for additional study.

Research and Outreach

Upon review of research materials, including subdivision maps, historic building permits, and archival Los Angeles Times newspaper articles, surveyors discovered that the houses on this block of 59th Place had been subdivided by the Goodyear Tire & Rubber Company. In its purchase of 480 acres of land in Southeast Los Angeles in 1919 for a tire factory, Goodyear set aside 80 acres for affordable housing to be sold to Goodyear employees. Called Goodyear Gardens and designed by prominent Los Angeles architects Sumner Hunt and Silas Burns as modest interpretations of their respective styles, the residential tract was advertised as being conveniently located near factory jobs and streetcar lines. Only forty-nine of the planned subdivision of eight hundred single-family residences were actually built; in 1922, Goodyear began selling off the rest of the land to real estate speculators, possibly due to the rapidly increasing value of land during the Southern California boom years of the early 1920s. Community outreach did not yield any additional information on the housing tract.

Application of the Citywide Historic Context Statement

Based on the reconnaissance survey and research, surveyors identified the housing tract as a potential residential historic district associated with three contexts and associated themes of the citywide historic context: residential architecture, residential development, and industrial development/labor history in Los Angeles. Based on analysis of the potential district within the eligibility criteria and standards for each theme, surveyors determined that the district met only those associated with labor history. It is a significant example of an early housing subdivision constructed by an important industrial manufacturer, Goodyear Tire & Rubber Company, for its workers (fig. 10.12). This type of housing development, planned and constructed by an industrial employer, was extremely rare in Los Angeles in the early twentieth century. Under comparative analysis, no other examples of company-built single-family worker housing have been recorded for SurveyLA, making this district the only known survivor of the heritage resource type.

SurveyLA Multiple Property Approach Applied to Worker Housing
Label Data
Context: Industrial Development, 1850-1980
Theme: Labor History, 1870-1980
Sub Theme: Working-Class Communities, 1870-1980
Property Type: Residential District
Property Sub Type: Worker Housing
Geographic Location: Citywide
Area of Significance: Industry; Social History; Ethnic Heritage
Criteria:
A/1/1
Period of Significance: 1880-1980
Eligibility Standards:
  • Was constructed or used during the period of significance
  • Is a significant example of purpose-built worker housing or was an important place of recreation and socialization for the working class
Character-Defining/Associative Features:
  • Retains most of the essential character-defining features from the period of significance
  • For the National Register, properties associated with events that date from the last 50 years must possess exceptional importance
  • Worker housing may be associated with noted architects
Integrity Considerations:
  • Should maintain integrity of location, design, materials, feeling, and association from the period of significance
  • For historic district, the district as a whole should retain integrity of location, design, feeling, and association
  • Some original materials may be altered or removed
  • Adjacent land uses may have changed
  • In some cases, original use may have changed
ExpandFIGURE 10.12 Multiple property documentation approach applied to the evaluation of Goodyear Gardens tract in Los Angeles. Los Angeles City Planning Office of Historic Resources

Intensive Field Survey, Documentation, and Final Assessment

Field surveyors documented the Goodyear Gardens Historic District in the digital data collection system categorized as follows:

  • Context: Industrial Development

  • Theme: Labor History

  • Heritage resource type: Worker Housing/Residential District

During intensive-level documentation, each residence was recorded as “contributing” or “noncontributing” to the district based on an analysis of the impacts of alterations to the houses and integrity assessments. Although SurveyLA assessed heritage resources for significance under local, state, and national criteria for evaluation, due to a large number of contemporary intrusions in the district, including demolition, infill, and substantial alterations to some houses, surveyors determined it to meet local (city) criteria only. Surveyors prepared a narrative summary statement of significance to justify and complete the evaluation process.

Notes

  1. In the more than twenty years that primary author Katie Horak has been conducting field surveys, the countless hours formerly spent on labeling photos, coloring maps by hand with colored pencils, and printing thousands of pages of survey inventory forms have been reduced to mere clicks of a button. ↩︎

  2. Although community outreach is an integral component of a successful field survey, the focus of this section is implementation of the technical aspects of the survey. See Public Outreach and Engagement in chapter 8. ↩︎

  3. Using interns for field surveys is also a low-risk way for consulting firms to test the capabilities of junior staff in a project-specific, time-limited role. Interns who perform highly are often offered permanent employment at the end of the term of the internship, as was the case for many SurveyLA interns. ↩︎

  4. SurveyLA also included a placeholder category called “Other” for resources identified during field surveys that merited further study but that did not fall within the context, themes, or property types defined for the citywide historic context (). ↩︎

FIGURE 10.1 SurveyLA heritage field surveyor at work. Architectural Resources Group, Los Angeles
Sample Survey Project Timeline
  MONTH 1 MONTH 2 MONTH 3 MONTH 4 MONTH 5 MONTH 6 MONTH 7 MONTH 8 MONTH 9 MONTH 10 MONTH 11 MONTH 12 MONTH 13
                                                                                                         
Data Collection System Installation / Preload Data Review 1 week   1 week  
Data Collection System Installation / Preload Data Review   2 weeks  
Research 25 weeks  
Thematic Framework/Historic Context Statement 11 weeks   11 weeks  
Reconnaissance Survey   11 weeks  
Intensive Field Survey and Recording   25 weeks  
Data Downloads   1 week   2 weeks   1 week   2 weeks   2 weeks  
Data Management/Revisions   29 weeks  
Project Team Peer Review   1 week   1 week   1 week  
Feedback Logs   46 weeks  
Survey Reports   1 week   1 week   1 week  
FIGURE 10.2 Sample SurveyLA field survey schedule illustrating the sequencing of tasks and estimated times for completion. Los Angeles City Planning Office of Historic Resources
FIGURE 10.3 Field survey staffing model showing key positions and participants in the field survey process. Los Angeles City Planning Office of Historic Resources
FIGURE 10.4 Classroom training conducted for SurveyLA. Surveyors received classroom training on recording methods and procedures, field photography, and use of the citywide historic context. Los Angeles City Planning Office of Historic Resources
FIGURE 10.5 Field training conducted for SurveyLA. During hands-on field training, surveyors practiced using the mobile digital data collection system to record various resource types in geographic areas selected for the pilot surveys. Los Angeles City Planning Office of Historic Resources
FIGURE 10.6 Chronology map for the Westchester–Playa Del Rey community plan area illustrating a primarily post–World War II period of development. Architectural Resources Group, Los Angeles
FIGURE 10.7 Map developed for conducting a reconnaissance survey in the city of Tustin, California. Architectural Resources Group, Los Angeles
FIGURE 10.8 Sample structure for organizing a heritage survey peer review panel. Janet Hansen
FIGURE 10.9 SurveyLA’s peer review committee provided input to identify the multiple layers of significance relating to Los Angeles’s Leimert Park neighborhood. Los Angeles City Planning Office of Historic Resources
FIGURE 10.10 Evaluation process for heritage surveys. Resource evaluation is the culmination of field surveys, research, and community outreach and collaboration. Janet Hansen
SurveyLA Multiple Property Approach Applied to Worker Housing
Label Data
Context: Industrial Development, 1850-1980
Theme: Labor History, 1870-1980
Sub Theme: Working-Class Communities, 1870-1980
Property Type: Residential District
Property Sub Type: Worker Housing
Geographic Location: Citywide
Area of Significance: Industry; Social History; Ethnic Heritage
Criteria:
A/1/1
Period of Significance: 1880-1980
Eligibility Standards:
  • Was constructed or used during the period of significance
  • Is a significant example of purpose-built worker housing or was an important place of recreation and socialization for the working class
Character-Defining/Associative Features:
  • Retains most of the essential character-defining features from the period of significance
  • For the National Register, properties associated with events that date from the last 50 years must possess exceptional importance
  • Worker housing may be associated with noted architects
Integrity Considerations:
  • Should maintain integrity of location, design, materials, feeling, and association from the period of significance
  • For historic district, the district as a whole should retain integrity of location, design, feeling, and association
  • Some original materials may be altered or removed
  • Adjacent land uses may have changed
  • In some cases, original use may have changed
FIGURE 10.12 Multiple property documentation approach applied to the evaluation of Goodyear Gardens tract in Los Angeles. Los Angeles City Planning Office of Historic Resources
of