Science
Field Projects
Education
Publications and Videos
Research Resources
Public Programs
About the Conservation Institute



Conservation Institute Home Science Current Projects Alternative Climate Controls for Historic Buildings Project Components Component Four
Component Four
Alternative Climate Controls for Historic Buildings

Component Four: Casa de Rui Barbosa
Located in Rio de Janeiro, the house museum of Rui Barbosa pays homage to one of Brazil's most prominent jurists and intellectuals of the late 19th and early 20th centuries. Inhabited from 1895 until 1923, the year of Rui Barbosa's death, the residence was purchased by the Brazilian government in 1924, together with the vast archives contained in the library. Casa de Rui Barbosa was opened to the public in 1930 and represented the first house museum in Brazil. While other components of the Alternative Climate Control project have examined applications to storage areas with limited visitation, Casa de Rui Barbosa presents the unique opportunity to incorporate visitor comfort issues along with the environmental requirements needed for collection conservation and historic building preservation. Except for localized air conditioning units positioned in working areas (water condensation within wall spaces has been an issue in these areas), interior conditions of the museum have remained largely uncontrolled. Open-window ventilation throughout the house has also been diminished as several windows, which were once open, are now closed to minimize the damaging effects of sunlight and air pollution (gaseous and particulate).

A collaborative effort between the Getty Conservation Institute (GCI) and the Casa de Rui Barbosa Foundation (FCRB)—funded by the Vitae Foundation in São Paulo focused on the installation of a GCI-designed climate control system in the library rooms of Casa de Rui Barbosa. Housing the bulk of the book collection on display in the museum, the Constitution, Civil Code, Civilista, and Casamento Civil Rooms also represent the most visited area of Casa de Rui Barbosa. Project concept as well as the design of climate control system were presented at the 12th Annual Congress of the Associação Brasileira de Conservadores e Restauradores de Bens Culturais (ABRACOR) in Fortaleza, Brazil, September 2007.

An article in the Spring 2007 issue of Conservation, the GCI Newsletter describes the project and the climate control strategies developed for the library. The climate system was installed in October 2006 and had a yearlong monitoring and adjustment period. Both the collection and visitor environments have been significantly improved since the installation.

In conjunction with this collaborative effort, a climate control workshop was conducted at the FCRB in March 2008 for participants from thirteen cultural institutions in Brazil.

Details of the project will be presented at the 13th Annual Congress of the Associação Brasileira de Conservadores e Restauradores de Bens Culturais (ABRACOR) Porto Alegre, Brazil, in September 2008.

Last updated: August 2008

Project Components

Component One

Component Two

Component Three

Component Four

Project Sections

Project Summary

Project Partners and Team Members

Project Components

Project Images

Related Publications

Experts' Roundtable


See Also

Past Science Projects

About GCI Science

All Current GCI Projects


Back to Top