|
| Research Home
|
|||||
| ID: 700061601 Page link: http://vocab.getty.edu/page/cona/700061601 | Record Type: Built Work |
| Raytheon Executive Offices (structure (single built work); Anderson, Beckwith & Haible; date unavailable; Concord (Middlesex, Massachusetts, United States, North and ...) | |
| Note: Located in: Concord, Massachusetts, United States | |
| Titles: |
| Raytheon Executive Offices (preferred,C,U,English-P,,N) |
| Catalog Level: item |
| structure (single built work) [300004794] (preferred) |
| ..... (Objects Facet, Built Environment (hierarchy name), Single Built Works (hierarchy name), single built works (built environment), <single built works by general type>) |
| architecture (preferred) |
| Creation Date: date unavailable |
| Anderson, Beckwith & Haible [preferred,BWR] |
| Anderson, Beckwith & Haible, engineer (American architectural firm, active in United States in 1969) [500516070] |
| Locations: |
| Current: Concord [7013646] Middlesex county (county), Massachusetts (state), United States (nation), North and Central America (continent), World (facet) (Geographic) |
| Address Note: +42.45,-71.3333; Concord, Massachusetts, United States |
| Display Materials: unavailable |
| Dimensions: unavailable |
| architecture (preferred,isness,undetermined) |
| List/Hierarchical Position: |
..... Built Works |
.......... temporary alphabetical list: Built Works |
............... temporary alphabetical list: BWR Built Works |
| Sources and Contributors: | |
| Raytheon Executive Offices | ........ [BWR] |
| ........ BWR database (2010-) | |
| Subject: ....... [BWR] |
| ....................... BWR database (2010-) BWR3763440 |
| ....................... BWR-07 Data Reconciliation (2020-2021) processed 2020-2021 |
| ....................... BWR SSID (2010-) 3763440 |
| ....................... BWR DSSC ID (2010-) 55984 |
| ....................... Avery: D&A Molitor, BWR contribution (2010-) |
| Note: | |
| English | ..... [BWR] |
| ..... BWR database (2010-) BWR3763440 | |
|
|
||||||||
|
||||||||