Conservation image Orpheus Mosaic (1988–1989)
A project of the Getty Conservation Institute
 

The mosaic, fully rolled onto the drum. A bulldozer with a large, maneuverable scoop—from which the ropes attached to the drum could be suspended—was used to transport the mosaic. Photo: J. Claire Dean.